Armoury Road – Waste Handling Building Extension, Birmingham

For: Veolia

Client / End User: Veolia

Services Provided: Civil Engineering & Building Services

Scope: Construction of an extension to an existing MRF building. Works included providing an 18x16m building to accommodate a new baler and bale storage area, pit construction to accept the baler conveyor and forming an opening to the side of the building to accommodate the conveyor. A fire suppression system to both new extensions and the existing MRF was also required which involved the installation of 695m³ water tank and pumping system.

Unusual aspects: The site continued to operate receiving waste and sorting throughout the contract period which required close cooperation and communication with the site operator.
We also held the position of Principal Contractor for our works and the client’s installation works for the shredder & baler.