Locker Room Building – Building extension, Derbyshire

For: Nestle UK
Client / End User: Nestle UK Ltd

Services Provided: Civil Engineering & Building Construction Main Contractor Principal Contractor under CDM

Scope: Construction of 2 storey extension to an existing locker room. (original previously built by Alpha) to provide Nestle UK with much needed additional space due to a planned expansion of production workforce. This required the demolition of an existing loading bay canopy , the removal of live services .The extension matches the existing building in it’s design and construction and comprises of piled foundations, a steel work frame and brick faced building with aluminium doors and windows.

Other aspects: The work was complete within the confines of the operational coffee factory and required careful traffic and pedestrian management especially during the demolition phase .